Home › Trade software › Solar installer software
Made in NZ · Solar PV quotes · Electricity (Safety) Regulations CoC · EIPC Part 6 · Network approvalSolar installer software for NZ — quote PV systems, issue CoC & network approval
Toolie is job-management, quoting, invoicing and compliance software built for NZ solar installers. Quote PV systems by kW, panel count and inverter type with NZ rates, track Certificate of Compliance (CoC) for every installation, and manage Orion/Vector/EA Networks grid-connection applications.
No credit card · Cancel anytime · Works offline on site · Flat NZD pricing
See how Toolie works for solar installers
From the system size to a priced quote, the string check and the generation estimate the client sees, the lines-company application and the systems you’ve installed — in the order you’d actually use it.
Every screen here is the real Toolie app running a made-up demo business — the clients and addresses are invented, the screens are real.
- 01 Quote the systemQuote System size and roof, priced from your takeoff
- 02 Strings and generationDesign String check, kWh, savings and payback
- 03 Certificates and approvalsCertificates CoC, RoI, ESC and the lines-company application
- 04 RegistersRegisters Grid connections, systems installed and certificates
Chapters
01
Quote the system
Pick from solar job types — grid-tied, battery add-ons, complete solar + battery, off-grid, microinverters, maintenance and removal — and enter the system you’re quoting.
- Solar job types: grid-tied string inverter, battery add-on, complete solar + battery, off-grid, microinverter systems, annual maintenance and decommissioning
- Auto takeoff: system size, panel wattage, roof type, panels per row and cable runs become panels, rails, splices, clamps, roof brackets, DC isolators, MC4 pairs and cable
- Options for export limiting, two-storey roofs (scaffold rather than edge protection), the network’s DG application fee and the independent inspection
- Labour hours from the takeoff’s solar labour norms, your rate, markup on materials and GST
02
Strings and generation
Check the strings against your datasheets and the site’s temperatures, then put a generation and savings estimate on the quote — with the method printed alongside.
- PV string check: modules and inverters from your own datasheet library, the site’s coldest and hottest temperatures and the modules on each roof face → strings per MPPT with pass/fail reasons
- Cold Voc and hot Vmp from the module’s own temperature coefficients (AS/NZS 5033:2021 Method A), checked against the inverter and your dwelling DC limit
- One DC isolator per string, DC:AC ratio and the array kWp, added to the quote with a printable calc sheet
- Generation + savings: PVGIS kWh for each roof face at the address, the client’s own import and buy-back rates and self-use → yearly kWh, first-year savings and simple payback
- Printed on the quote with the method, source and assumptions — an estimate, not a guarantee
03
Certificates and approvals
Every job type lists what the regulations and the Code require for it — and Fill in + issue opens each one pre-filled from the quote.
- Certificate of Compliance (regulation 65) and an independent Record of Inspection (regulation 72) for high-risk PV work, with the high-risk database lodgement (regulation 74F)
- Electrical Safety Certificate within 20 working days of connection (regulations 74A and 74C)
- Maintenance visits and removals get the paperwork that applies to them, not an install’s
- Grid connection application under Electricity Industry Participation Code 2010 Part 6, Schedule 6.1, with the distributor’s response deadline counted in business days
- Covers the Network Connections Amendment processes from 1 December 2026 as well as Parts 1, 1A and 2
04
Registers
Every application you’re waiting on, every system you’ve installed and every certificate you’ve issued — with what’s due next.
- Grid connections: each application’s stage, the distributor’s Code deadline or your own follow-up, and what you owe them after approval
- Systems installed: panels, inverter and battery with each warranty’s end date, monitoring, CoC / RoI numbers and a yearly check
- Certificates issued (CoC / ESC / RoI) with circuit test results, shared with the electrician pack
- Search and CSV export for every register
Everything in the solar installer pack
Quote residential and commercial PV systems with NZ rates
Solar PV pricing depends on system size (kW peak), panel brand and efficiency, inverter type (string vs micro vs hybrid), battery storage, roof type, orientation and grid-connection complexity. Toolie’s NZ solar pricebook covers panel supply-and-install per Wp, inverter by type and size, mounting hardware, AC and DC cabling, switchboard upgrades and battery storage. Override any rate with your supplier pricing.
Certificate of Compliance — mandatory for every NZ solar installation
Solar PV connections to the electrical installation are prescribed electrical work under the Electricity (Safety) Regulations 2010. Every NZ solar installation requires a Certificate of Compliance (CoC) and Electrical Safety Certificate (ESC) from a registered electrician or certifying electrical inspector (CEI). Toolie lists the CoC, ESC and Record of Inspection each solar job needs, prints them ready to sign, and shows the inspector’s 20-working-day high-risk-database lodgement on every job.
EIPC Part 6 and grid-connection applications
Generating systems connected to the grid in NZ must comply with Part 6 of the Electricity Industry Participation Code (EIPC) and the distributor’s technical standard. Network applications to Orion, Vector, EA Networks and other distributors require technical documentation (inverter datasheets, single-line diagrams, protection settings). Toolie’s grid-connection tracker records the application date, distributor contact and approval status for each installation.
High-risk PEW — the 20-working-day database deadline
Solar PV installations are high-risk prescribed electrical work. Under the Electricity (Safety) Regulations 2010, the Record of Inspection must be entered in the WorkSafe high-risk database within 20 working days of inspection. Toolie shows that deadline on every solar job so it isn’t forgotten.
Quote, comply and get paid — flat price for your crew
Flat: Solo $49, Duo $89, Crew $129, Pro $249 (NZD ex-GST). 14-day free trial, no credit card, no lock-in. Quote a solar job free before you create an account.
Related: electrician software · invoicing · software for every trade · all features.
NZ compliance guide
Solar Installation Certification NZ: CoC, RoI, Grid — What an NZ solar PV install needs: high-risk certification (CoC, Record of Inspection, ESC), lines company connection approval and the 1 Dec 2026 Code changes.
Common questions
Does Toolie include NZ solar PV pricing?
Yes. Toolie ships a NZ solar pricebook covering panel supply-and-install per Wp, inverter by type and size, mounting hardware, cabling and battery storage. Override with your supplier rates.
Does Toolie generate the CoC and ESC for solar installations?
Yes. Toolie lists the Certificate of Compliance, Electrical Safety Certificate and Record of Inspection each solar job needs and prints them ready to sign, with your EWRB (Electrical Workers Registration Board) registration on file.
Can Toolie track the 20-working-day high-risk PEW deadline for solar?
Yes. Solar PV is high-risk prescribed electrical work. Toolie shows the 20-working-day high-risk-database lodgement (counted from the Record of Inspection) on every solar job.
Is there an NZ-built alternative to Tradify or Fergus for solar installers?
Yes. Toolie is New Zealand-built, flat-priced for your whole crew, includes solar PV pricing, and lets you quote a job before you sign up.
How much does solar installer software cost in NZ?
Flat NZD ex-GST: Solo $49, Duo $89, Crew $129, Pro $249 — one price for the whole crew, not per user. 14-day free trial, no credit card, no lock-in.
Quote, comply and get paid — in one place
Start free today. Built around NZ electrical safety regulations, EIPC Part 6 & CCA 2002.
Try the Generation + savings free →








