Home › Trade software › Roofing software

Made in NZ · For NZ roofers

Roofing software for NZ roofers — quote re-roofs, prove compliance, protect your margin

Toolie quotes roofs the way you price them — long-run and flashings by the linear metre, not just square metres — then issues the PS3 and Record of Work your consent sign-off needs. Built to the NZ Metal Roof and Wall Cladding Code of Practice.

No credit card · Cancel anytime · Works offline on site · Flat NZD pricing

New Roofer quote · Re-roof — long-run steel, Tauranga · swipe to see it all →
Toolie roofer quote for a long-run steel re-roof at a fictional Tauranga address, listing the manufacturer material warranty, the installer workmanship warranty and the asbestos survey the job needs
Pick the job, see the paperwork. A re-roof on a 1970s house: Toolie lists both warranties and, because the building is pre-2000, the asbestos survey — citing the Asbestos Regulations 2016 — before you price a sheet.

See how Toolie works for roofers

From the job type to a priced re-roof, the consent and asbestos paperwork it needs, the roof designed plane by plane, and the warranty register that keeps every roof’s maintenance on track — in the order you’d use it.

Every screen here is the real Toolie app running a made-up demo business — the clients and addresses are invented, the screens are real.

  1. 01 Quote the roofQuote Job type, takeoff and a priced total
  2. 02 Consent, asbestos and warrantiesPaperwork What each roofing job needs, before you start
  3. 03 Roof DesignerDesign Outline and pitch to planes, true lengths and sheets
  4. 04 Flashings and guttersFlashings Folded profiles and E1 downpipe sizing
  5. 05 Roof warranty registerRegister Every roof, its warranties and its washdowns

01

Quote the roof

Pick from roofing job types — new long-run, re-roofs, tile, membrane flat roofs, spouting and downpipes, skylights, solar mounting, repairs — and enter the measurements you’d price from, or let the Roof Designer fill them in.

  • Auto takeoff: plan area and pitch become the true roof area (plan ÷ cos pitch), with ridge, hips, valleys, barges, aprons and eaves turned into material lines
  • Downpipes estimated from the eave length when you leave them blank, and downpipe metres from your measured drop
  • Site flags that change the materials: high-wind or coastal zone adds cyclone fixing assemblies, purlins over 1.2 m add safety mesh, a cut-up roof takes 13% waste instead of 7.5%
  • Minimum-pitch check for corrugate, trapezoidal and tray profiles — confirm against the NZ Metal Roof & Wall Cladding COP and the manufacturer
  • A roofer pricebook (long-run profiles, underlay, flashings, spouting, fixings, skylights, safety and access) you can override with your own supplier prices
  • Labour hours and rate, materials markup and GST, with the scope the client sees drafted from the job
Auto takeoff · filled from the Roof Designer · swipe to see it all →
Toolie roofer auto takeoff filled by the Roof Designer: 197.28 m2 plan footprint, 22.5 degree pitch, 12 m ridge, 32.24 m hips, 5.09 m valleys, 62.4 m eaves, 7 downpipes at 2.7 m drop, built 1974
Measured once, by the designer. 197.28 m² plan at 22.5°, 12 m of ridge, 32.24 m of hips, 62.4 m of eaves and 7 downpipes — each field marked as calculated by the Roof Designer.
Quote total · labour, materials, GST · swipe to see it all →
Toolie roofer quote totals: materials $22,837.71, labour $8,360.00 at 88 hours and $95 an hour, 15% markup $3,425.66, GST $5,193.50, total $39,816.87
Priced and ready to send. 88 hours at $95, materials $22,837.71 plus the 15% markup and GST: $39,816.87 — with the client’s scope drafted from the roof measurements.

Back to chapters ↑

02

Consent, asbestos and warranties

Every job type shows the paperwork it needs and why, with the Act or regulation behind it — and a button to generate the record.

  • New roofs: building consent (Building Act 2004 s40) and a PS3 (Construction) with the manufacturer’s compliance statement for the Code Compliance Certificate
  • Re-roofs: like-for-like is usually exempt under s42A and Schedule 1 Part 1 cl 1, but a change of material or a roof that failed early (cl 1(3)(c)) needs consent — Toolie says to confirm with the council
  • Built before 2000? An asbestos survey before strip-out (Health and Safety at Work (Asbestos) Regulations 2016, regs 19–20, 25/26), flagged as blocking site start
  • The two-warranty handover: the manufacturer’s material warranty and your own workmanship warranty (NZBC B2)
  • H1 insulation record when a new roof or re-roof changes the insulation
Toolie roofer quote on a phone showing the re-roof job type and the compliance paperwork: material warranty, workmanship warranty and the pre-2000 asbestos survey
On site, on your phone. The same quote: job type, then the warranties and the asbestos survey the re-roof needs.

Back to chapters ↑

03

Roof Designer

Type a rectangle or L-shape, draw the outline or trace it on an aerial photo, set the pitch — and get every plane, hip, valley and ridge at true length, then a sheet cut list.

  • Outline as the roof edge or the walls plus eave and gable overhangs; hip, gable, skillion or a custom pitch per edge
  • Plan and true (sloped) area, ridge, hips, valleys, barges, eaves and apex height, drawn on a labelled roof plan
  • Sheet cut list per plane from your profile’s cover width, gutter overhang and roll-former length increment
  • Screws from your purlin centres and fixing pattern; end laps checked against the maximum run you enter (NZMRM COP 7.1.4 calculator or the manufacturer)
  • Fill the takeoff, or add the designed roof as a quote part, with a calc sheet kept on the job
Roof Designer · L-shaped hip roof · swipe to see it all →
Toolie Roof Designer showing an L-shaped hip roof at 22.5 degrees: plan 197.28 m2, true 213.534 m2, ridge 12 m, hips 33.597 m, valleys 5.305 m, eaves 62.4 m, with a roof plan of six planes
Every plane, at true length. An L-shaped hip roof at 22.5°: 197.28 m² on plan, 213.534 m² true, 33.597 m of hips and 5.305 m of valley across six planes.
Roof Designer · sheet cut list · swipe to see it all →
Toolie Roof Designer sheet cut list for 762 mm cover corrugate: 95 sheets, 312.81 lm, 238.36 m2 cover for 213.53 m2 of roof, 10.4% waste, 1524 screws, sheet lengths with quantities
The order, by length. 762 mm cover corrugate at 900 mm purlin centres: 95 sheets, 312.81 lm, 10.4% waste and 1524 screws — with a warning that end laps aren’t checked until you enter the maximum run.

Back to chapters ↑

04

Flashings and gutters

Draw each flashing the way you fold it and size the spouting and downpipes from the site’s rainfall — from your numbers, never guessed.

  • Flashing profiles by leg, fold angle and hem, with the girth and fold count worked out and drawn
  • Ridge, hip, barge, apron, valley and top-edge runs at true length, split into pieces by your roll-former’s maximum length and lap
  • Gutters and downpipes per E1/AS1 §5.1: every eave is a gutter section, with the catchment and flow for each
  • Rainfall intensity from NIWA HIRDS or E1/AS1 Appendix A, and the catchment per downpipe from E1/AS1 Table 5 — Toolie never guesses them
Roof Designer · flashings · swipe to see it all →
Toolie Roof Designer flashing drawing of a barge flashing with legs of 100, 120 and 50 mm, a 10 mm hem, girth 280 mm and 3 folds, above a cut list of ridge, hip and valley flashings
Draw it, fold it, order it. A barge flashing with a 280 mm girth and 3 folds; at a 6 m maximum folded length the 33.6 m of hip capping becomes 9 pieces.
Roof Designer · gutters and downpipes · swipe to see it all →
Toolie Roof Designer gutter sizing at 110 mm/h rainfall intensity: each eave with its length, catchment, flow in litres per second and number of downpipes
Downpipes per eave. At 110 mm/h and your 60 m² per downpipe, the 17.4 m eave catches 65.46 m² and gets 2 downpipes.

Back to chapters ↑

05

Roof warranty register

Every roof you’ve done, with the manufacturer’s warranty, your workmanship warranty and the maintenance that keeps the warranty valid.

  • Owner, site, roof material, manufacturer, product and colour, area and completion date
  • Manufacturer and workmanship warranty expiry worked out from the terms you enter, with a warning when the warranty isn’t marked as registered
  • Maintenance log with reminders every 6 or 12 months from the last visit, and a “services due” list to remind the customer or book the job
  • A printable roof warranty and maintenance record, and CSV export
Roofer registers · roof warranties & maintenance · swipe to see it all →
Toolie roofer registers screen with two roofs in the roof warranties and maintenance register and a roof maintenance check in the services due list
Every roof, with the next washdown. Two roofs on the register; the one on a 6-month cycle is already in the services-due list with Remind customer and Book job.
Roof warranty + maintenance record · swipe to see it all →
Printed Toolie roof warranty and maintenance record for a fictional Mount Maunganui roof: COLORSTEEL Maxx trapezoidal, 148 m2, warranty WR-48213 registered, maintenance log entry, warranty expiry dates
The record the owner keeps. Product, warranty reference WR-48213, the 2026-04-20 washdown in the log and both warranties running to 2033-03-02.

Back to chapters ↑

Everything in the roofer pack

Roof DesignerOutline and pitch → planes, true lengths, sheet cut list, flashings and E1 gutter sizing.
Auto takeoffPlan area, pitch and runs become priced roofing material lines you can adjust.
Consent & PS3Building consent and PS3 flagged for new roofs; re-roof exemption and its limits explained.
Asbestos surveyPre-2000 re-roofs flagged under the Asbestos Regulations 2016 before strip-out.
WarrantiesManufacturer material warranty and your workmanship warranty, generated from the quote.
H1 insulation recordRequired against achieved roof R-value when the insulation changes.
Roof warranty registerWarranty expiry, maintenance log and washdown reminders for every roof.

Quote long-run, flashings and accessories to the COP

Take off tray and long-run by pitch, plus ridging, spouting, underlay and purlins by the linear metre, priced to the NZ Metal Roof and Wall Cladding Code of Practice — the recognised document for E2/AS1 weathertightness — instead of a flat per-m² guess. Toolie applies the pitch factor to convert plan area to true roof area automatically.

PS3 and Record of Work generated on the job

Restricted building work needs the roofer’s PS3 Producer Statement and Record of Work for consent sign-off. Toolie emits both as real PDFs and packs the E2/AS1 weathertightness evidence for the Code Compliance Certificate, with your LBP Roofing number on file.

Flag when a re-roof needs consent

Toolie flags consent-required re-roofs — a change of material or profile isn’t a like-for-like Schedule 1 exemption — and bundles the evidence (Record of Work, PS3, product specs) so nothing’s missing at sign-off.

Progress-claim staged roofs and protect cashflow

Issue deposit and staged progress invoices to cover the gap between buying long-run and getting paid, then back-cost actual crew hours and supplier bills against the quote to defend your margin.

Height H&S prestart attached to the job

A roof-edge working-at-height prestart and Safe Work Method Statement attach straight to the job, aligned to WorkSafe’s roofing focus — scaffold and edge protection priced as a non-optional line.

One flat price for your whole crew — and a demo before you sign up

Toolie is flat: Solo $49, Duo $89, Crew $129, Pro $249 (NZD ex-GST) — add the whole crew free, not per user. 14-day free trial, no credit card, no lock-in. And you can quote a real job on the demo before you ever create an account.

Related: PS3 & producer statements · Record of Work · consent tracker · progress claims & retentions · software for every trade.

NZ compliance guide

Roofing PS3, Record of Work & Re-roof Consent NZ — What NZ roofers must hand over: when a re-roof needs consent, the PS3 producer statement, the LBP Record of Work, pre-2000 asbestos checks and warranties.

Free roof area calculator

Quick check on site: the roof area calculator gives the true roof area, pitch factor, ridge, hips and spouting from the house size and pitch.

Common questions

Can Toolie issue a PS3 for roofing?

Yes. Toolie generates the PS3 Producer Statement and Record of Work for your portion of restricted building work as real PDFs, with the E2/AS1 weathertightness evidence packed for council Code Compliance Certificate sign-off.

How do I quote a re-roof in NZ?

Toolie takes off long-run or tray by roof pitch and flashings, ridging and spouting by the linear metre, priced to the Metal Roofing Code of Practice — the way re-roofs are actually costed, not a flat per-m² rate.

Does the roofing app track job margin?

Yes. Toolie back-costs real crew hours and supplier invoices against your quote per job, so you see estimate-vs-actual margin instead of finding out at year-end.

Does a re-roof need a building consent?

Often, depending on scope — a change of roof material or a structural change usually does, while like-for-like can be exempt. Toolie flags consent-required re-roofs and bundles the Record of Work, PS3 and product specs as your evidence.

How much does roofing software cost in NZ?

Flat NZD ex-GST: Solo $49, Duo $89, Crew $129, Pro $249 — one price for the whole crew, not per user. 14-day trial, no card.

Does Toolie tell me when a re-roof needs a building consent?

Yes. A new roof is flagged as needing building consent (Building Act 2004 s40) and a PS3. A like-for-like re-roof is usually exempt under Schedule 1, but Toolie flags the cases that aren’t — a change of material, or replacing a roof that failed early — and tells you to confirm with the council.

Does Toolie check for asbestos before a re-roof?

When you enter a build year before 2000, the re-roof quote lists an asbestos survey and management record under the Health and Safety at Work (Asbestos) Regulations 2016 and flags it as blocking site start until a competent person has inspected.

Quote, comply and get paid — in one place

Start free today. Built around NZS 3604, H1, Healthy Homes & CCA 2002. One flat price for your whole crew.

Try the Roof Designer free →