Home › Plumbers, gasfitters & drainlayers › Gas safety certificate NZ

Made in NZ · Plumbers

Gas Safety Certificate NZ: the gasfitter’s two certificates

Gasfitting work in New Zealand is certified twice: once before the gas is turned on, to say the work is compliant, and once after connection, to say the finished installation is safe to use. Most of the confusion on site is about which is which, who signs, and what the clock is. This guide covers the Gas Safety Certificate (GSC), the gasfitting Certificate of Compliance (CoC), the high-risk database entry, and the record-keeping that sits behind both.

No credit card · Cancel anytime · Works offline on site · Flat NZD pricing

Two certificates, two moments: CoC before, GSC after

The Certificate of Compliance certifies the work itself. It is issued when the gasfitting is finished and tested, before the installation goes live, and gasfitting is not considered complete until it exists. The Gas Safety Certificate comes later. Under the Gas (Safety and Measurement) Regulations 2010 every gasfitting job needs one once the work has been completed and connected, and it records that the connected installation is safe to use and has not affected the safety of any other part of the gas installation. The two can be combined on one form under regulation 85A, with duplicated details such as the address written once. Certificates can be paper or electronic, they must carry the Authentication Mark, and an electronic signature that uniquely identifies the person responsible is acceptable.

Which gasfitting jobs need which certificate

The regulations sort gasfitting into low-risk, general and high-risk work, and the category sets the paperwork. Low-risk work is, broadly, work that was exempt from certification before the 2013 changes. High-risk work includes additions or alterations to an existing installation (other than simple replacement), work where the means of compliance departs from the prescriptive route in the regulations, and jobs with additional identified hazards such as a gas hob in a caravan or boat with sleeping quarters. Everything else is general work. WorkSafe’s practitioner guide also makes the point that there is no longer a blanket exemption for installations on small LPG cylinders: a new hob on a 9 kg cylinder is general gasfitting.

The Gas Safety Certificate: who issues it and by when

The person who makes the connection issues the GSC (or their supervisor, if they were working under supervision) once satisfied the installation is safe to use. If they are not satisfied, the regulations require them to disconnect immediately, so a GSC is never a courtesy form signed to clear the diary. The timing: as soon as practicable after connection to the gas supply, and no later than 20 working days after connection. A copy goes to the client (or the occupier if the client cannot be reached), and the issuer keeps every GSC for at least seven years. Parties named in the regulations, which include WorkSafe and the Board, can ask for a copy; WorkSafe’s guidance says the GSC copy is due within seven working days of a request. Note the clock: it starts at connection, not at completion of the pipework, so a job that is finished in March but connected in May is timed from May.

The gas CoC: before connection, and not too early

A CoC is required for all general and high-risk gasfitting (regulation 46) and is optional for low-risk work. The person who did the work or supervised it, and who is authorised to certify that category of gasfitting, is responsible for issuing it. Regulation 48 spells out what goes in it: the standard the work complies with, any certified design, other standards relied on, the manufacturer’s instructions, the gas type and pressure, that the parts are safe to connect, where the work is, who did what, any supervisees, and the dates. Under regulation 51(1)(c) the person connecting must issue or sight a CoC, and it must have been issued no earlier than six months before the connection. So a CoC that sits in the van for seven months does not support a connection; a fresh one is needed. Hand the client a copy, keep yours for seven years, and supply a copy of the CoC within 10 working days of a request from the parties listed in the regulations (WorkSafe’s guidance), which include WorkSafe and the Board.

High-risk gasfitting and the high-risk database

For high-risk work, the person who issues the CoC must enter selected details of the work on the Electricity and Gas High-risk Database within 20 days of issuing the CoC (WorkSafe’s guidance on the high-risk database). This is an online entry, not a certificate, and you should note the lodgement reference against the job. The most common trigger on a plumber’s day sheet is an alteration or addition to a house that already has gas: a new gas hob on an existing supply line, a relocated califont, or an extra branch off the meter. Treat any job on an existing installation as potentially high-risk until you have checked the category.

Who may sign, and what the licence has to do with it

Gasfitting is a separately licensed trade under the Plumbers, Gasfitters and Drainlayers Act 2006, and authorisation attaches to the individual practitioner. A certifying gasfitter works and certifies unsupervised. A gasfitter working under supervision does not certify: the supervising certifying gasfitter does, which makes the supervisor the person whose name and licence number carry the liability. Check your PGDB registration and current practising licence number before it goes on a certificate, and make sure apprentices and supervisees are named where the CoC asks for them. For the Building Code side of flues and ventilation, see our gas, flues and ventilation page.

Tracking the dates in Toolie

Toolie’s plumber pack has a gas certificates register. Each job records the risk category, gas type, CoC number and issue date, the connection date, and the GSC number and issue date, together with a table of appliances and the tests done on each. The register then shows whichever deadline is open: connect before the six-month CoC window closes, issue the GSC within 20 working days of connection, give the client their copy within 20 working days of issue, and lodge high-risk CoC details within 20 working days of issue. It skips weekends and national public holidays when counting working days, but regional anniversary days are not excluded from the count, so check your region if a date is tight. The CoC and GSC print ready to sign or save as PDF, and carry a reminder to check against the official form before issuing. You can open the register pre-filled from a quote. The high-risk database entry itself is still yours to make on WorkSafe’s system.

You can sign a certificate with your finger on the phone, and the register numbers each one automatically (GC-0001 for the CoC, GS-0001 for the GSC). Email to customer sends the signed certificate as a PDF and stamps the copy-given date, which clears the reminder to give the client their copy. On a gas job, the gas CoC (where the work needs one) stops the job being marked Completed until it’s issued, or until you record why you are overriding it.

Sources

Official sources this guide relies on. Rules change, so check the current version before relying on a date or threshold.

One flat price for your whole crew — and a demo before you sign up

Toolie is flat: Solo $49, Duo $89, Crew $129, Pro $249 (NZD ex-GST) — add the whole crew free, not per user. 14-day free trial, no credit card, no lock-in. And you can quote a real job on the demo before you ever create an account.

Related: gas, flues and ventilation (G11) · hot water and tempering valves (G12) · PS3 and producer statements · invoicing. Back to plumbers software · software for every trade.

Common questions

How long do I have to issue a Gas Safety Certificate in NZ?

As soon as practicable after the gasfitting is connected to the gas supply, and no later than 20 working days after connection. A copy must also reach the client (check the current regulations for the exact deadline), and you must keep the certificate for at least seven years.

What is the difference between a gas Certificate of Compliance and a Gas Safety Certificate?

The Certificate of Compliance certifies that the gasfitting work was done lawfully and safely, and is issued before connection. The Gas Safety Certificate is issued after connection and certifies that the connected installation is safe to use and has not affected the rest of the installation. They can be combined on one form.

Do I need a Certificate of Compliance for low-risk gasfitting?

No. A CoC is optional for low-risk gasfitting but required for all general and high-risk gasfitting. A Gas Safety Certificate is still required for low-risk work once it is connected.

Which gasfitting jobs go on the high-risk database?

High-risk gasfitting, which includes additions or alterations to existing installations (other than simple replacement), work that departs from the prescriptive means of compliance, and work with additional hazards. The person who issued the CoC enters the details within 20 working days of issuing it.

Can an apprentice or gasfitter under supervision sign a Gas Safety Certificate?

The GSC is issued by the person doing the connection, or by their supervisor where they were working under supervision. A gasfitter under supervision does not certify their own work, so the supervising certifying gasfitter is the one accountable for the certificate.

Can Toolie remind a customer their backflow test is due?

Yes. When a device's test comes due in the backflow register, it shows under Services due. Remind customer emails or texts them, and Book job creates the visit; completing that job adds a test row and moves the next due date on. The Pass/Fail result is left for you to enter. You press the button each time, it does not send on its own.

Quote, comply and get paid — in one place

Start free today. Built around NZS 3604, H1, Healthy Homes & CCA 2002. One flat price for your whole crew.

Try Toolie on a job free →